Media

21-Aug-2025

NT News

Tylah Tully chats with Star Minerals (ASX:SMS) managing director Ashley Jones about the company’s latest gold assay results from its Tumblegum South project.

21-Aug-2025

Cairns Post

Star Minerals releases gold assay results from its Tumblegum South project, boosting its economics for a planned scoping study.

21-Aug-2025

Rat's Rant

SMS - Star Minerals Limited today closed up another 10% to finish at 5.5c on $660k stock traded. There was no news out today but on Tuesday they announced assay results from its Tumblegum South Gold Project located in WA.

21-Aug-2025

Townsville Bulletin

Star Minerals releases gold assay results from its Tumblegum South project, boosting its economics for a planned scoping study.

Tylah Tully chats with Star Minerals (ASX:SMS) managing director Ashley Jones about the company’s latest gold assay results from its Tumblegum South project.

20-Aug-2025

The Australian

The potential of the Tumblegum South project near Meekatharra in WA is growing with Star Minerals (ASX:SMS) recording infill drilling assays up to 5m grading 30.91g/t gold from 21m, including 2m at 75.45g/t.

Shallow, closed-spaced infill drilling was carried out at a density sufficient to delineate geological continuity of mineralisation to a high degree of confidence.

Results from 22 of 38 holes validate the geological model underpinning the resource of 45,000oz gold completed in 2023.

“We are pleased to see the quality of these first results from the Tumblegum South gold project drilling program,” MD Ashley Jones said.

“With the standout intercept so far being 5m at around an ounce of gold per tonne, Tumblegum South is proving to be an even stronger project, with a quality gold deposit.”

The company aims to start mining in Q1 2026 at Tumblegum South, which is near underutilised mills owned by Westgold Resources (ASX:WGX) and Catalyst Metals (ASX:CYL).

20-Aug-2025

Stockhead

The potential of the Tumblegum South project near Meekatharra in WA is growing with Star Minerals (ASX:SMS) recording infill drilling assays up to 5m grading 30.91g/t gold from 21m, including 2m at 75.45g/t.

Shallow, closed-spaced infill drilling was carried out at a density sufficient to delineate geological continuity of mineralisation to a high degree of confidence.

Results from 22 of 38 holes validate the geological model underpinning the resource of 45,000oz gold completed in 2023.

20-Aug-2025

The Australian Mining Review

Star Minerals (ASX: SMS) has received positive results from its first round of assay results for drilling at its Tumblegum South gold project in WA.

The drilling program included 38 holes for a total of 2032m, 22 of which have been returned, interpreted and announced.

Star Minerals managing director Ashley Jones says the company is pleased to see the quality of these first results from the project.

“With the standout intercept so far being 5m at [about 1oz/t gold], Tumblegum South is proving to be an even stronger project, with a quality gold deposit,” he said.

19-Aug-2025

Brisbane Times

Star Minerals has intercepted several impressive drill hits, including a standout 5 metres at 30.91 grams per tonne (g/t) gold from 21m, from the latest infill drilling program at the company’s Tumblegum South gold project in Western Australia’s Mid West region. The company is looking to bring the project into production early next year.

19-Aug-2025

Bulls n Bears

Star Minerals (ASX: SMS) has intercepted several impressive drill hits, including a standout 5 metres at 30.91 grams per tonne (g/t) gold from 21m, from the latest infill drilling program at the company’s Tumblegum South gold project in Western Australia’s Mid West region. The company is looking to bring the project into production early next year.

Results from the first round of assays from the program at Tumblegum South, 40 kilometres south of Meekatharra, returned stellar shallow gold results of 5m at 30.91g/t from 21m, including 2m going 75.45g/t, 5m grading 10.85g/t from 5m, including 2m at 25.65g/t from 6m, and 8m running at 6.96g/t from 17m. The interval also contained a solid 2m slice at 20.05g/t.
19-Aug-2025

NT News

Star Minerals’ infill drilling has increased the confidence in the geological continuity of resources at its Tumblegum South gold project near Meekatharra, WA.